HYDROLOGY & HYDROGEOLOGY

Neo Environmental have designed swales and various SuDS schemes for projects ranging from solar farm and wind developments in flood risk areas, to residential and commercial developments.

Neo Environmental can provide the expertise and in-house knowledge required for conducting hydrological assessments, including Flood Risk Assessments (FRAs), for proposed developments. The company has undertaken numerous FRAs for major developments and Hydrology and Geohydrology Chapters for EIAs. We have also provided tailor made SuDS solutions to mitigate potential issues in proximity to GWDTEs (Ground Water Dependent Terrestrial Ecosystems) and areas susceptible to flooding due to increased surface run-off.

Our consultants have significant experience of liaising with Local Planning Authorities (LPAs) and Environmental agencies throughout the UK and Ireland in relation to hydrological and geo-hydrological constraints.

Our Hydrology Services include:

Flood Risk Assessments (FRA’s)
Desk Based Assessments
Sustainable Drainage Systems (SuDS)
CAR (Controlled Activities Regulations) License Applications
Hydrological Surveys and Site Assessments
Hydro-Ecology Surveys And Statistical Analysis
Hydro-Electric Project Assessments
Hydraulic Modelling

CASE STUDIES

Mannington 50MW Battery Storage Project

Neo Environmental were involved in various stages of the 49.9MW Mannington Battery Energy Storage System (BESS) from initial constraint analysis and site suitability assessment to planning and condition compliance. The Energy Storage Facility is located in Greenbelt in Dorset and our planning team successfully argued a case for Very Special Circumstances (VSC) for the project. […]


Horsepasture 150MW Battery & Solar Project

Neo Environmental undertook all work for the 3 phases of the Proposed Development which included, feasibility studies, planning and the full suite of environmental and technical assessments. This include two separate solar applications of circa 50MW (original site and extension) and the 100MW battery storage project, all of which were consented. The team co-ordinated and […]


South Meath 60MW Solar Farm

Neo Environmental were commissioned to coordinate and undertake the full suite of environmental assessments required to accompany a planning application for a large-scale solar farm within South Meath. The substantial development covers an area of circa 130ha and required detailed assessments. from an early stage in the proposed development, this included input into the EIA […]


Trinity Hall 15MW Solar Farm

Neo Environmental Ltd were involved in various stages of the 15MW Trinity Hall Solar Farm in Central Bedfordshire from initial constraint analysis and site suitability assessment to on- site surveys and post submission support works. The Solar Farm is located in Greenbelt in Central Bedfordshire. A case for Very Special Circumstances (VSC) was made and […]


Join the Neo Environmental Mailing List

* indicates required

HEAD OFFICE

Unit 20 Flexspace,
Bellshill industrial estate, Belgrave Street,
Bellshill,
ML4 3NP
T: 0141 846 8975

NORTHERN IRISH OFFICE

83-85 Bridge Street
Ballymena,
Northern Ireland,
BT43 5EN
T: 0282 565 04 13

DUBLIN OFFICE

C/O Origin Enterprises PLC
4-6 Riverwalk, Citywest Business Campus
Dublin 24, D24 DCW0
E: info@neo-environmental.ie
T: 00 353 (1) 5634900

BRISTOL OFFICE

Spaces 8th Floor
The Programme Building,
Bristol,
BS1 2NB
T: 0141 773 6262

WARRINGTON OFFICE

Lakeview 600
Lakeside Dr,
Centre Park Square,
Warrington, WA1 1RW
T: 01925 984 682


CONNECT WITH US
ACCREDITATIONS
nqa-iso9001-ukas