PROJECT TYPE: Battery Energy Storage System (BESS)
SIZE: 49.9MW
LOCATION: Dorset, England
CLIENTS: Renewable Connections (Mannington Energy Centre Limited)

Neo Environmental were involved in various stages of the 49.9MW Mannington Battery Energy Storage System (BESS) from initial constraint analysis and site suitability assessment to planning and condition compliance.

The Energy Storage Facility is located in Greenbelt in Dorset and our planning team successfully argued a case for Very Special Circumstances (VSC) for the project. The VSC report concluded that the overall strategic performance and function of the remaining Green Belt would prevail, with the benefits of the Proposed Development considerably outweighing the minor adverse impacts identified.

Our team undertook and compiled various planning and environmental assessments and reports including ecology, landscape, archaeology & heritage, noise, arboriculture, traffic and transportation and hydrology (flood risk & drainage). As part of their fieldwork, our ecologists conducted bat surveys surveys in support of the Ecological Impact Assessment (EcIA) and also conducted a Habitat Regulations Assessment (HRA).

East Dorset Council provided an excellent service given the current circumstances relating to COVID-19; the planning application was consented with no pre-commencement conditions attached. We look forward to seeing the completed development in due course.

NEO INVOLVEMENT

Planning Statement production, management and submission;

Topographic survey;

Automatic Traffic Count (ATC) Surveys;

Environmental Assessments including:

    • Ecological Impact Assessment (EcIA)
    • Habitat Regulations Assessment (HRA)
    • Biodiversity Plans (BP)
    • Invasive Non-native Species Strategy
    • Landscape and Visual Assessment (LVIA)
    • Landscape and Ecology Management Plan (LEMP)
    • Flood Risk Assessment / Drainage Impact Assessment (FRA/DIA)
    • Cultural Heritage Impact Assessment (CHIA)
    • Noise Impact Assessment (NIA)
    • Construction Traffic Management Plan (CTMP)
    • Outline Construction Environmental Management Plan (OCEMP)
    • Arboricultural Impact Assessment (AIA)

 

LEMP

INDICATIVE INFRA LAYOUT



Join the Neo Environmental Mailing List

* indicates required

GLASGOW HEAD OFFICE

Wright Business Centre,
1 Lonmay Road,
Glasgow
G33 4EL
T: 0141 773 6262

NORTHERN IRISH OFFICE

83-85 Bridge Street
Ballymena,
Northern Ireland,
BT43 5EN
T: 0282 565 04 13

DUBLIN OFFICE

C/O Origin Enterprises PLC
4-6 Riverwalk, Citywest Business Campus
Dublin 24, D24 DCW0
E: info@neo-environmental.ie
T: 00 353 (1) 5634900

WARWICK OFFICE

Valiant Office Suites
Lumonics House, Valley Drive,
Swift Valley, Rugby,
Warwickshire, CV21 1TQ
T: 01788 297012

WARRINGTON OFFICE

Cinnamon House, Cinnamon Park
Crab Lane, Fearnhead,
Warrington,
Cheshire, WA2 0XP
T: 01925 661 716


CONNECT WITH US
ACCREDITATIONS
nqa-iso9001-ukas