Infrastructure and Utilities

Neo Environmental has conducted Planning and environmental assessments for various public utility companies and private developers for medium voltage and high voltage connections. We have consented strategic and nationally significant electricity developments.

Infrastructure is the basic physical and organizational structures and facilities (e.g. buildings, roads, power supplies) needed for the operation of a society or enterprise. Utilities provide basic needs that significantly improve a community’s quality of life, spurring social and economic growth.

The infrastructure and utilities sectors have seen major growth and are constantly expanding due to increased electricity, water and transport demands. Neo Environmental have undertaken planning, environmental and technical services for both the planning and construction stages of such projects.

As well as the planning stages, we have undertaken significant work for the construction phase of infrastructure and utilities projects, where we have managed and undertaken environmental, ecological, archaeological, ornithological Clerks of Works (CoWs). We are working with a number of electricity suppliers such as Scottish Power Energy Networks and are on a number of frameworks.

Our Services Include

Screening exercises – with the new EIA Regulations requiring ‘front loading’ by competent experts for this stage, neo environmental are often commissioned to produce these or provide input
SID applications
Scoping for EIA
Full EIAs
Bespoke Assessments (see Services section)
Full Environmental Report Packages
Repowering and reinstatement of sites
Discharging of environmental conditions
Clerks of Works
Due Diligence reports
Glint & Glare Assessments for glass fronted buildings

CASE STUDIES

Mannington 50MW Battery Storage Project

Neo Environmental were involved in various stages of the 49.9MW Mannington Battery Energy Storage System (BESS) from initial constraint analysis and site suitability assessment to planning and condition compliance. The Energy Storage Facility is located in Greenbelt in Dorset and our planning team successfully argued a case for Very Special Circumstances (VSC) for the project. […]


Join the Neo Environmental Mailing List

* indicates required

HEAD OFFICE

Unit 20 Flexspace,
Bellshill industrial estate, Belgrave Street,
Bellshill,
ML4 3NP
T: 0141 846 8975

NORTHERN IRISH OFFICE

83-85 Bridge Street
Ballymena,
Northern Ireland,
BT43 5EN
T: 0282 565 04 13

DUBLIN OFFICE

C/O Origin Enterprises PLC
4-6 Riverwalk, Citywest Business Campus
Dublin 24, D24 DCW0
E: info@neo-environmental.ie
T: 00 353 (1) 5634900

BRISTOL OFFICE

Spaces 8th Floor
The Programme Building,
Bristol,
BS1 2NB
T: 0141 773 6262

WARRINGTON OFFICE

Lakeview 600
Lakeside Dr,
Centre Park Square,
Warrington, WA1 1RW
T: 01925 984 682


CONNECT WITH US
ACCREDITATIONS
nqa-iso9001-ukas