PROJECT TYPE: Solar Farm
SIZE: 15MW
LOCATION: Bedfordshire, England
CLIENTS: European Energy

Neo Environmental Ltd were involved in various stages of the 15MW Trinity Hall Solar Farm in Central Bedfordshire from initial constraint analysis and site suitability assessment to on- site surveys and post submission support works.

The Solar Farm is located in Greenbelt in Central Bedfordshire. A case for Very Special Circumstances (VSC) was made and concluded that the overall strategic performance and function of the remaining Green Belt would prevail, with the benefits of the Proposed Development considerably outweighing the minor adverse impacts identified.

NEO INVOLVEMENT

Topographic survey;
Environmental Assessments including:
Ecological Impact Assessment (EcIA)
Biodiversity Management Plans (BMP)
Landscape and Visual Assessment (LVIA)
Landscape and Ecology Management Plan (LEMP)
Flood Risk Assessment / Drainage Impact Assessment (FRA/DIA)
Cultural Heritage Impact Assessment (CHIA)
Noise Impact Assessment (NIA)
Construction Traffic Management Plan (CTMP)
Outline Construction Environmental Management Plan (OCEMP)
Arboricultural Impact Assessment (AIA)

LEMP DRAWING

INDICATIVE INFRA LAYOUT



Join the Neo Environmental Mailing List

* indicates required

GLASGOW HEAD OFFICE

Wright Business Centre,
1 Lonmay Road,
Glasgow
G33 4EL
T: 0141 773 6262

NORTHERN IRISH OFFICE

83-85 Bridge Street
Ballymena,
Northern Ireland,
BT43 5EN
T: 0282 565 04 13

DUBLIN OFFICE

C/O Origin Enterprises PLC
4-6 Riverwalk, Citywest Business Campus
Dublin 24, D24 DCW0
E: info@neo-environmental.ie
T: 00 353 (1) 5634900

WARWICK OFFICE

Valiant Office Suites
Lumonics House, Valley Drive,
Swift Valley, Rugby,
Warwickshire, CV21 1TQ
T: 01788 297012

WARRINGTON OFFICE

Lakeview 600
Lakeside Dr,
Centre Park Square,
Warrington, WA1 1RW
T: 01925 984 682


CONNECT WITH US
ACCREDITATIONS
nqa-iso9001-ukas