Neo Environmental were involved in various stages of the 49.9MW Mannington Battery Energy Storage System (BESS) from initial constraint analysis and site suitability assessment to planning and condition compliance. The Energy Storage Facility is located in Greenbelt in Dorset and our planning team successfully argued a case for Very Special Circumstances (VSC) for the project. […]
Neo Environmental undertook all work for the 3 phases of the Proposed Development which included, feasibility studies, planning and the full suite of environmental and technical assessments. This include two separate solar applications of circa 50MW (original site and extension) and the 100MW battery storage project, all of which were consented. The team co-ordinated and […]
Neo Environmental undertook all work for the 3 phases of the Proposed Development which included, feasibility studies, planning and the full suite of environmental and technical assessments. This include two separate solar applications of circa 50MW (original site and extension) and the 100MW battery storage project, all of which were consented. The team co-ordinated and […]
Neo Environmental were commissioned to coordinate and undertake the full suite of environmental assessments required to accompany a planning application for a large-scale solar farm within South Meath. The substantial development covers an area of circa 130ha and required detailed assessments. from an early stage in the proposed development, this included input into the EIA […]
Neo Environmental are delighted to have started 2022 with an approval via a delegated decision for a 100MW co-located solar and battery storage project near Hull for its client Albanwise. Neo Environmental done all of the planning, public consultation and environmental work for this large project, including the design, ecology, archaeology (including a geophysical survey), […]
Neo Environmental undertook all work for the various stages of a Proposed 155MW solar and battery storage Development near Athenry in Co. Galway. This included the initial feasibility studies and full planning for the project (105MW solar and 50MW battery). We undertook all elements including the pre-application process with the council, site visits, planning and […]
Neo Environmental were commissioned to undertake a number of reports for a large mixed use development in Melrose, Scotland. The project involves an upgrade to the Newtown St Boswells’ auction mart, as well as the creation of retail facilities, a hotel, up to 150 houses and a new campus for Borders College As part of the […]
Neo Environmental were commissioned to coordinate the Environmental Impact Assessment (EIA) process for a planning permission in principle planning application submitted to the City of Edinburgh Council for a proposed housing development at Riccarton Mains Village. Members of staff attended the pre-application meetings. Following on from the receipt of the Screening Direction, notifying that an EIA was […]
Neo Environmental Ltd were involved in various stages of the 15MW Trinity Hall Solar Farm in Central Bedfordshire from initial constraint analysis and site suitability assessment to on- site surveys and post submission support works. The Solar Farm is located in Greenbelt in Central Bedfordshire. A case for Very Special Circumstances (VSC) was made and […]
Neo Environmental were involved in various stages of the 42MW Solar Farm from initial constraint analysis and site suitability assessment to planning and post submission support works. As part of the planning work Neo environmental worked with the Applicant, Renewable Energy Systems (RES), to design an appropriate scheme which is well screened, with very limited […]
Neo Environmental were involved in various stages of the 100MW Gorman Energy Storage Facility (ESF) from initial constraint analysis and site suitability assessment to planning and condition compliance. Our planning and environmental team had to manage a number of constraints including flood risk, archaeology, visual impacts and access and transport in order to achieve consent […]
Unit 20 Flexspace,
Bellshill industrial estate, Belgrave Street,
Bellshill,
ML4 3NP
T: 0141 846 8975
83-85 Bridge Street
Ballymena,
Northern Ireland, BT43 5EN
T: 0282 565 04 13
C/O Origin Enterprises PLC
4-6 Riverwalk, Citywest Business Campus
Dublin 24, D24 DCW0
E: info@neo-environmental.ie
T: 00 353 (1) 5634900
Spaces 8th Floor
The Programme Building,
Bristol,
BS1 2NB
T: 0141 773 6262
Lakeview 600
Lakeside Dr,
Centre Park Square,
Warrington, WA1 1RW
T: 01925 984 682