PROJECT TYPE: Solar Farm
SIZE: 42MW
LOCATION: Devon, UK
CLIENTS: Renewable Energy Systems (RES)

Neo Environmental were involved in various stages of the 42MW Solar Farm from initial constraint analysis and site suitability assessment to planning and post submission support works.

As part of the planning work Neo environmental worked with the Applicant, Renewable Energy Systems (RES), to design an appropriate scheme which is well screened, with very limited impacts on public amenity and the environment. The project went through a number of design iterations in order to ensure the development fit sympathetically and congruously within the local environment. Areas of flood risk and priority habitat were avoided to reduce potential adverse impacts.

Our planning and environmental team undertook and compiled a number of assessments and reports in order to achieve consent for Devons largest solar development. These included an Ecological Assessment (EcA), Landscape and Visual Assessment (LVA), Cultural Heritage Impact Assessment (CHIA), Construction Traffic Management Plan (CTMP), Outline Construction Environmental Management Plan (OCEMP) and Arboricultural Impact Assessment. A Biodiversity Net Gain Assessment was also undertaken which highlighted a 91.18% gain in area habitat units; this gain well exceeds the 10% requirement that is expected to become law in the near future.

The project attracted a lot of media attention, however following a significant amount of public engagement, the Proposed Development was approved at committee on the 4th of November 2021 with members voting 5-4 in favour.

We look forward to seeing the completed development in due course.

NEO INVOLVEMENT

Planning works: Planning Statement, Design and Access Statement and Statement of Community Involvement
Solar Farm Design and Technical Drawing production
Environmental Assessments including:
Construction Traffic Management Plan (CTMP) and Road Condition Surveys
Noise Impact Assessment
Flood Risk Assessment and Drainage Impact Assessment
Archaeology Assessment, Evaluation and Fieldwork~
Phase 1 and Protected Species Surveys, Ecological Assessment, Net Gain Assessment and Biodiversity Management Plan (BMP)
Landscape and Visual Assessment (LVA) and Landscape and Ecology Mitigation Plan (LEMP)
Topographic survey

Infrastructure Layout

Illustrative Management Plan



Join the Neo Environmental Mailing List

* indicates required

GLASGOW HEAD OFFICE

Wright Business Centre,
1 Lonmay Road,
Glasgow
G33 4EL
T: 0141 773 6262

NORTHERN IRISH OFFICE

83-85 Bridge Street
Ballymena,
Northern Ireland,
BT43 5EN
T: 0282 565 04 13

DUBLIN OFFICE

C/O Origin Enterprises PLC
4-6 Riverwalk, Citywest Business Campus
Dublin 24, D24 DCW0
E: info@neo-environmental.ie
T: 00 353 (1) 5634900

WARWICK OFFICE

Valiant Office Suites
Lumonics House, Valley Drive,
Swift Valley, Rugby,
Warwickshire, CV21 1TQ
T: 01788 297012

WARRINGTON OFFICE

Lakeview 600
Lakeside Dr,
Centre Park Square,
Warrington, WA1 1RW
T: 01925 984 682


CONNECT WITH US
ACCREDITATIONS
nqa-iso9001-ukas