Article: Windfarm Repowering
Date: February 13, 2013

Neo Environmental have submitted a planning application for the repowering of a wind farm on the East coast of England. The new application will see a reduction in the number of wind turbines on the site, which are being replaced by other more efficient turbines of a similar scale and design. The original wind farm has been in operation since the early 90’s and proves the sustainable nature of these wind energy generators. The UK has 82 wind farms which began operating between 1992 and 2004.

Windfarm Repowering

Join the Neo Environmental Mailing List

* indicates required

GLASGOW HEAD OFFICE

Wright Business Centre,
1 Lonmay Road,
Glasgow
G33 4EL
T: 0141 773 6262

NORTHERN IRISH OFFICE

83-85 Bridge Street
Ballymena,
Northern Ireland,
BT43 5EN
T: 0282 565 04 13

DUBLIN OFFICE

C/O Origin Enterprises PLC
4-6 Riverwalk, Citywest Business Campus
Dublin 24, D24 DCW0
E: info@neo-environmental.ie
T: 00 353 (1) 5634900

WARWICK OFFICE

Valiant Office Suites
Lumonics House, Valley Drive,
Swift Valley, Rugby,
Warwickshire, CV21 1TQ
T: 01788 297012

WARRINGTON OFFICE

Lakeview 600
Lakeside Dr,
Centre Park Square,
Warrington, WA1 1RW
T: 01925 984 682


CONNECT WITH US
ACCREDITATIONS
nqa-iso9001-ukas