Welcome to Neo

With HTML5 Video and Bootstrap 4

Neo Environmental undertook all work for the 3 phases of the Proposed Development which included, feasibility studies, planning and the full suite of environmental and technical assessments. This include two separate solar applications of circa 50MW (original site and extension) and the 100MW battery storage project, all of which were consented. The team co-ordinated and undertook the pre-application meetings with the council, site visits and also co-ordinated and undertook all of the planning and environmental works as well as the design (Planning reports, ecology, archaeology, noise, transport, hydrology, glint and glare, landscape and visual). This was part of a portfolio of projects that Neo received consent for (100% successful consent rate), including three 100MW battery storage projects.

Neo Environmental undertook all work for the 3 phases of the Proposed Development which included, feasibility studies, planning and the full suite of environmental and technical assessments. This include two separate solar applications of circa 50MW (original site and extension) and the 100MW battery storage project, all of which were consented. The team co-ordinated and undertook the pre-application meetings with the council, site visits and also co-ordinated and undertook all of the planning and environmental works as well as the design (Planning reports, ecology, archaeology, noise, transport, hydrology, glint and glare, landscape and visual). This was part of a portfolio of projects that Neo received consent for (100% successful consent rate), including three 100MW battery storage projects.

Neo Environmental are delighted to have started 2022 with an approval via a delegated decision for a 100MW co-located solar and battery storage project near Hull for its client Albanwise. Neo Environmental done all of the planning, public consultation and environmental work for this large project, including the design, ecology, archaeology (including a geophysical survey), noise, traffic and transport, landscape and visual, hydrology, glint and glare and land classification assessment. The project consists of approximately 100 thousand solar panels and 24 battery storage containers on a circa 90 ha site.

Neo Environmental undertook all work for the various stages of a Proposed 155MW solar and battery storage Development near Athenry in Co. Galway. This included the initial feasibility studies and full planning for the project (105MW solar and 50MW battery). We undertook all elements including the pre-application process with the council, site visits, planning and environmental works (Planning reports, ecology, archaeology, noise, transport, hydrology, glint and glare, landscape and visual). This was one of a number of sites for this client who we still work with on various projects across the UK and Ireland (100% successful consent rate). The project was consented in 2021. Neo Environmental also conducted the Strategic Infrastructure Development (SID) elements for the project.

Neo Environmental were commissioned to undertake a number of reports for a large mixed use development in Melrose, Scotland. The project involves an upgrade to the Newtown St Boswells’ auction mart, as well as the creation of retail facilities, a hotel, up to 150 houses and a new campus for Borders College As part of the project Neo Environmental helped produce the EIA Screening report before completing various environmental assessments including ecology, archaeology, landscape and visual and noise. The site was located directly adjacent a number of ecological designations including two Special Areas of Conservation (SACs) and two Sites of Special Scientific Interest (SSSIs). Therefore a significant level of ecological assessment and consultation was required as part of the project. The Development was consented in March 2021.

Join the Neo Environmental Mailing List

* indicates required

GLASGOW HEAD OFFICE

Wright Business Centre,
1 Lonmay Road,
Glasgow
G33 4EL
T: 0141 773 6262

NORTHERN IRISH OFFICE

83-85 Bridge Street
Ballymena,
Northern Ireland,
BT43 5EN
T: 0282 565 04 13

DUBLIN OFFICE

C/O Origin Enterprises PLC
4-6 Riverwalk, Citywest Business Campus
Dublin 24, D24 DCW0
E: info@neo-environmental.ie
T: 00 353 (1) 5634900

WARWICK OFFICE

Valiant Office Suites
Lumonics House, Valley Drive,
Swift Valley, Rugby,
Warwickshire, CV21 1TQ
T: 01788 297012

WARRINGTON OFFICE

Lakeview 600
Lakeside Dr,
Centre Park Square,
Warrington, WA1 1RW
T: 01925 984 682


CONNECT WITH US
ACCREDITATIONS
nqa-iso9001-ukas