Article: BREEAM Work
Date: March 27, 2014

Neo Environmental have just completed a post installation noise survey and plant assessment at a College extension in Slough. The assessment was sought to enable the client to gain the Pol 5 credit of BREEAM 2011.The survey involved monitoring the levels of the installed plant and the baseline background noise levels, to determine if the noise emission from the building met with the BREEAM criteria. On this occasion the noise from the building exceeded the BREEAM criteria, so Neo had to offer mitigation measures in the form of specialist acoustic enclosures around the plant, which will result in a 25dBA sound reduction. Once the enclosures are in place the BREEAM Pol 5 criteria will be achieved.

Neo also conducted Ecological works for the site including training on-site staff and constructing an ecological management plan.

Acoustics

Join the Neo Environmental Mailing List

* indicates required

GLASGOW HEAD OFFICE

Wright Business Centre,
1 Lonmay Road,
Glasgow
G33 4EL
T: 0141 773 6262

NORTHERN IRISH OFFICE

83-85 Bridge Street
Ballymena,
Northern Ireland,
BT43 5EN
T: 0282 565 04 13

DUBLIN OFFICE

C/O Origin Enterprises PLC
4-6 Riverwalk, Citywest Business Campus
Dublin 24, D24 DCW0
E: info@neo-environmental.ie
T: 00 353 (1) 5634900

WARWICK OFFICE

Valiant Office Suites
Lumonics House, Valley Drive,
Swift Valley, Rugby,
Warwickshire, CV21 1TQ
T: 01788 297012

WARRINGTON OFFICE

Lakeview 600
Lakeside Dr,
Centre Park Square,
Warrington, WA1 1RW
T: 01925 984 682


CONNECT WITH US
ACCREDITATIONS
nqa-iso9001-ukas